NIWA's outlook for November to January expects a very strong El Niño, with above-average temperatures across the North Island and the east of the South Island. Stats NZ reported 41,091 new homes consented in the year ended September 2026, up 18% on the year before, so plenty of crews are tied up on new builds just as homeowners start looking at their decks.
In this post · 6 sections
What customers will be asking for, and why
Picture the message: the deck's gone spongy by the back door, the in-laws arrive for Christmas, can someone look at it. Variations on that land every year from now until the holidays. With NIWA expecting a warm summer, people are planning to live outside, and the deck is suddenly the most important room in the house.
Expect a mix of soft boards, rotten joists near the house, loose handrails and wobbly steps, plus re-decks on old frames and the odd full rebuild. With so many crews on new builds, the smaller repair jobs often go begging, or go to whoever replies first. That can be you.
What a customer checks before they choose who to call
- How fast you reply. A quick, specific answer beats a perfect one sent next week. Most people go with someone who responded while they were still thinking about it.
- A clear price, or at least a clear range and what changes it.
- Photos of past decks, and especially of frame work. Shots from underneath, of new joists and proper fixings, say far more than a glossy finished top.
- Reviews that mention turning up when promised and leaving the site tidy.
- Whether you explain what's wrong in plain words. Customers worried about rot want to understand the problem, not just get a number.
How to quote these jobs so they get accepted
Assume your customer has already looked up prices. Kettle's cost guide puts carpenters at $50 to $90 an hour, with an ordinary job running from about $500 to $8,000, typically around $2,500. Builders come in at $55 to $100 an hour, with an ordinary job running from about $2,000 to $30,000, typically around $8,000. That's their reference point, so if your price sits well outside it, say why.
- Split the frame from the boards. Price the structural work and the decking as separate lines, so the customer can see where the money goes.
- Give two options where it makes sense: a targeted repair now, or new boards on a sound frame. People like choosing, and it stops them comparing your rebuild with someone else's patch-up.
- Ask for photos from underneath before you visit. You'll price faster, and you'll know if the job is boards or a frame.
- Put the unknowns in writing. Say what you'll do if you lift the boards and find more rot, and how you'll price it before carrying on.
- Mention consent where it applies. If the height or barrier means a consent might be needed, say so early rather than after the deposit conversation.
The trap that costs you the job, or the review
The thing most customers don't know is that new boards on a tired frame can fail within a summer or two. If you quote a re-deck without checking underneath, you'll either win a job that comes back on you, or lose it to someone cheaper who didn't look. Spend the extra few minutes with a torch and a screwdriver, and tell the customer what you found. Being the one who explained the frame is how you win the job and the good review.
Get ready this week
- Update your profile photos with recent deck work, including shots from underneath.
- Write a short, plain description of the deck jobs you take and the ones you don't.
- Draft a quick reply you can adapt, asking for size, height, photos from underneath and timing.
- Decide how many small repair jobs you can fit around bigger work before Christmas, and be honest with customers about dates.
- Check you've got stock of the right fixings, including stainless for coastal jobs.
The takeaway
Reply fast, ask for photos from underneath, and quote the frame and the boards separately. That's most of what wins a deck job in December.
Decks get fixed before the barbecue season. Customers who post on Kettle get quotes from local businesses, and the ones that reply first with a clear price tend to get the job.
- Pergola build on concrete padSilverdale, Auckland, Auckland · Posted last week
- Exterior house wash in SilverdaleSilverdale, Auckland, Auckland · Posted 3 weeks ago
Questions people ask
How do I price a deck repair job?
Separate the structural work from the decking so the customer sees where the money goes, and ask for photos from underneath before you visit. Kettle's cost guide puts an ordinary carpenter job typically around $2,500 and an ordinary builder job typically around $8,000, which is the reference point many customers will have in mind.
How quickly should I reply to a quote request?
As quickly as you can, even if it's just to ask for photos and measurements. Customers often go with whoever replies first with something specific. A fast question beats a slow, perfect quote.
Does replacing a deck need a building consent in NZ?
It depends on the deck's height and what's being changed, and barriers have their own Building Code rules. Many like-for-like repairs don't need one. If you're unsure, check with the local council before the job starts and tell the customer early.
What photos should builders show customers?
Recent, real jobs, including shots of the frame and fixings from underneath, not just the finished top. Customers worried about rot want to see that you do the structural work properly.